Halifax Water will be performing maintenance work at the Herring Cove wastewater treatment facility located at 59 Village Road, Herring Cove. This work is scheduled between 9:00 AM and 2:00 PM on April 30th.
During this short maintenance period, wastewater will temporarily bypass the treatment facility and be discharged to Halifax Harbour and ultimately the Atlantic Ocean. This maintenance work is important to the system’s operation and will avoid the possibility of an emergency process shutdown.
To reduce pressure on the wastewater system and minimize environmental impact during this temporary maintenance period, we are asking customers to reduce wastewater flows in the areas shown (see attached map). Please minimize use of running water, flushing toilets, or doing laundry during this time.
To learn more, visit halifaxwater.ca/reducing-wastewater.
This work will not impact traffic.
We appreciate your assistance in this matter and apologize for any inconvenience this wastewater system maintenance work may cause.
To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.
